Case Study: Commercial Plant Room
The Forum School – CareTech/Cambian Group
Delivered by: Puraheat Plumbing & Heating Engineers Ltd
Sector: Specialist Education
Duration: 6 Weeks
Location: Dorset
Project Summary
Puraheat were appointed to deliver a full commercial plant room redesign for The Forum School, a specialist autism provision in Dorset managed by The Cambian Group.
Located in a historic manor house, the plant room had become a source of rising maintenance costs and unreliability. The brief was clear: strip out the outdated system, and design and install a modern, efficient, and resilient heating and hot water setup — all with minimal disruption to the live educational environment.
The Challenge
The plant room at The Forum School was serving a large, complex building using an ageing single gas-fired boiler, failing circulation pumps, and outdated controls. The hot water and heating system was regularly breaking down, with the client spending thousands annually on reactive repairs.
Before: Legacy boiler plant beyond its working life and outdated controls.
Before: A maze of dated iron pipework and neglected hot water storage vessels
The Cambian Group approached Puraheat with the goal of upgrading the system to modern standards while also reducing energy consumption, enhancing control, and increasing system reliability. Complicating matters, the kitchen had to remain open throughout — meaning hot water provision needed to be maintained 24/7 during the works.
Our Approach
Following a detailed survey and consultation, Puraheat developed a effective solution including full design, supply, and installation of:
- Three Vaillant ecoTEC plus 80kW high efficiency condensing boilers on a low-loss header rig for redundancy and modulation.
- Two Vaillant uniSTOR 500L fast-recovery cylinders to provide robust and responsive hot water delivery.
- A plate heat exchanger to isolate the new system from the building’s original cast iron pipework.
- Full commissioning of an existing cold water booster-set and storage tank which had been left incomplete by previous contractors.
- Installation of new Grundfos commercial pumps, serving more than seven independently controlled heating circuits.
- All pipework installed using Geberit M-Press press fittings, allowing for quick, clean, hot works–free installation.
During: Removing old plant and infrastructure in confined working conditions. Fitting out new boilers and stainless-steel & copper pipework.
Mechanical works approaching completion with tidy, insulated pipework throughout
Temporary hot water cylinder installed to maintain hot water demand and reduce disruption to the school.
To maintain service to the school kitchen, temporary hot water cylinders were installed outside the plant room. These were commissioned and tied in quickly, ensuring the catering team had continuous access while our engineers worked on the core system.
Working Environment
The plant room was tight, low-ceilinged, and had difficult access for removing existing equipment. The work was carried out over the summer break to reduce disruption to students, but kitchen and admin staff were still on-site daily — requiring precise scheduling and constant communication.
Our engineers liaised with the school facilities team daily and worked in phases to ensure critical services remained operational. Every pipe, component, and zone was mapped carefully before installation to minimise clashes and downtime.
The End Result
The finished plant room — compact, clean, and built for the future. Panoramic view of the full plant room: controls,, cylinders, pumps, and new Vaillant boilers.
The new system is delivering quieter operation, lower fuel costs, and far greater reliability. The smart controls platform makes it easy for the CareTech/Cambian facilities team to monitor and adjust system performance, while the separation of circuits via pumps and heat exchangers allows for precise control across the building’s different wings.
The school now benefits from:
- Greater heating reliability across 7+ zones
- Consistent hot water supply
- Better fuel efficiency and system performance
- Easier servicing and long-term maintainability
Client Feedback
The Cambian Group were extremely satisfied with the end result, especially the:
- Quality of the installation
- Minimal disruption to daily operations
- Clear communication from the Puraheat team
- Improved energy efficiency and control
- They have already expressed interest in rolling out similar upgrades across other
- Cambian sites based on the energy savings and operational benefits observed.
Why Choose Puraheat?
At Puraheat Plumbing & Heating Engineers Ltd, we specialise in complex plant room upgrades and commercial plumbing solutions. From schools to care homes, heritage buildings to modern offices — we deliver bespoke, high-performance systems tailored to your building’s needs.
We combine deep technical experience with a practical, client-focused approach. Whether you’re dealing with an ageing system, expanding capacity, or looking to reduce energy use — we can help.
Considering a Plant Room Upgrade?
Old, inefficient systems cost you more than just fuel. They’re harder to maintain, slower to respond, and prone to breakdowns.
If you’re ready to modernise, trust Puraheat to deliver a system that works — from day one, and for years to come.